Process Planning and Control

On this page

Details

What will you learn?

  1. Company Level Control Systems, (ERP), (MRPII), (MRP)
  2. Distributed Control Systems, System requirements, information requirements, monitors
  3. Scheduling Techniques, Schedule smoothing, forward/​backward scheduling, finite and infinite capacity, push versus pull, constraint theory
  4. Local Production Control Techniques, KanBan, Multi-product KanBan, MRP/JIT, Finite Scheduling software (such as PREDICTOR), Optimized Production Technology (OPT), Line of Balance, Period Batch Control
  5. Impact on the Supply Chain, EDI, user rates, replenishment times, notification period Preactor’ Process Planning Software will be taught as part of the module

Batch Size

No Minimum

Course Material

Provided

Module Delivery

Fast Track — 4 Hrs / Day
Regular Track — 2 Hrs / Day

Duration

50 Hrs

Admissions

Eligibility

MTPs are open to engineering graduates/​diploma holders, engineering students, and working professionals with an appropriate background.

Application Process

Batch 1 — January to March
Batch 2 — June to August
Batch 3 — September to November

Fees & Scholarships

₹6000

Contact
Manager - Training
Murali R
Email
email hidden; JavaScript is required
Phone
+91 80 4906 5555